Analisis Faktor-Faktor yang Mempengaruhi Produktivitas Tenaga Kerja pada Proyek Infrastruktur Transportasi

Authors

  • Salman Al Farisi Universitas Tarakanita Author

DOI:

https://doi.org/10.36914/jriik.v1.i1.14

Keywords:

Labor Productivity, Road Construction, RII, Project Management, Productivity Factors

Abstract

Road infrastructure projects are one of the most important sectors in national development, as they play a significant role in enhancing regional connectivity, economic growth, and equitable development. The successful implementation of road infrastructure projects is highly influenced by the effective management of project resources, particularly human resources or construction labor. This study aims to identify and analyze the factors affecting labor productivity in road infrastructure projects. The study classifies the factors influencing labor productivity into several main categories, namely labor factors, project management factors, material factors, equipment factors, and work environment factors. The research method was conducted by distributing questionnaires to 30 respondents. The collected data were analyzed using the Relative Importance Index (RII) method, resulting in the ranking of the top five factors based on their level of importance. The analysis results indicate that skill level ranks first with a value of 95.3%, followed by work experience, work discipline, and timely material delivery, which rank second, third, and fourth with values of 92.7%, respectively, while material availability ranks fifth with a value of 92%. In conclusion, these findings indicate that improving labor productivity is not only dependent on individual worker capabilities but also on project support systems, particularly effective and timely material management.

Views: 157Downloads: 95

References

Boy, R.A, (1986). Improving Total Corporate Productivity, Thomson Learning.

Creswell, J. W. (2018). Research Design: Qualitative, Quantitative, and Mixed Methods Approaches. California: Sage Publications.

Department of Labor United States of America. (2016). Productivity And Costs. Bureau of Labor Statistics. 4 Mei 2016. https://www.bls.gov/news.release/archives/prod2_05042016.pdf.

F.S. Ibrahim, M. Esa, R.A. Rahman. (2021). International Journal of Sustainable Construction Engineering and Technology 12 (2021) 56–67.

Famiyeh, S., Amoatey, C.T., Adaku, E. and Agbenohevi, C.S. (2017) Major causes of construction time and cost overruns: A case of selected educational sector projects in Ghana, Journal of Engineering, Design and Technology, 15(2): 181-198.

Hernandi, Y., Tamtana, J. S. (2020). Faktor-Faktor Yang Mempengaruhi Produktivitas Pekerja Pada Pelaksanaan Konstruksi Gedung Bertingkat. JMTS: Jurnal Mitra Teknik Sipil. Vol. 3, No. 2: hlm 299-312.

Jarkas, A. M., & Bitar, C. G. (2012). Factors affecting construction labor productivity in Kuwait. Journal of Construction Engineer ing and Management, 138(7), 811–820.

Jarkas, A. M. (2015). Factors influencing labour productivity in Bahrain’s construction industry. International Journal of Construction Management, 15(1), 94–108

Keputusan Kementerian Ketenagakerjaan No. KEP-150/MEN/1999 tahun 1999 tentang penyelenggaraan Program Jaminan Sosial Tenaga Kerja Bagi Tenaga Kerja Harian Lepas.

Latief, R. U., Anditiaman, N. M., Rahim, I. R., Arifuddin, R., & Tumpu, M. (2023). Labor Productivity Study in Construction Projects Viewed from Influence Factors. Civil Engineering Journal. Vol. 9, No. 03.

Li X, Chow KH, Zhu Y, Lin Y. (2016). Evaluating the impacts of high-temperature outdoor working environments on construction labor productivity in China: a case study of rebar workers. Build Environ. 2016;95:42–52.

Lin, R. T., & Chan, C. C. (2009). Effects of heat on workers’ health and productivity in Taiwan. Global Health Action. 2009 Nov 11;2.

Lindhard, S. M., Sadeghi, S., Soltanmohammadlou, N., & Wyke, S. (2025). A Literature Review Of Common Factors Affecting Labor Productivity In Asia: 25 Years Of Insight. Journal Of Civil Engineering And Management. Volume 31 Issue 3 Pages 248–265.

Lumbangaol, P., Saragi, Y., & Purba, L. H. (2024). Produktivitas Pekerja Proyek Konstruksi dan Faktor yang Mempengaruhi. Jurnal Darma Agung Volume: 32, Nomor: 4, (2024), Agustus: 75 – 84.

M. Urrahmi, C.Z. Oktaviani, Mubarak. (2024) in: E3S Web of Conferences, EDP Sciences.

Nurhendi, R. N, & Mukhlis N. B. (2023). “Faktor-Faktor Yang Mempengaruhi Produktivitas Tenaga Kerja Konstruksi: Tinjauan Literatur.” Jurnal Teknik Sipil UNPAL 13(1).

Nurhendi, R. N, & Mukhlis N. B. (2025). Menilai Faktor-Faktor Yang Mempengaruhi Produktivitas Tenaga Kerja Konstruksi Dengan Perspektif Kontraktor. Jurnal Deformasi. Volume 10-2.

Nurhendi, R. N., & Bastam, M. N. (2024). Tinjauan Faktor Utama Yang Mempengaruhi Produktivitas Tenaga Kerja Pada Proyek Konstruksi Dengan Pendekatan Peringkat Relative Importance Index (RII). Jurnal Deformasi, 9(2), 167–177.

O.J. Adebowale, J.N. Agumba. (2023). International Journal of Productivity and Performance Management 72 (2023) 1903–1923.

Pilcher, Roy. (1992). Principles of Construction Management 3 rd ed, McGraw-Hill, Inc, Singapore.

Pornthepkasemsant, P., & Charoenpornpattana, S. (2019). Identifi cation of factors affecting productivity in Thailand’s construc tion industry and proposed maturity model for improvement of the productivity. Journal of Engineering, Design and Technol ogy, 17(5), 849–861.

Pradhana, R. D., Trianto, A., Fansuri, M. H. (2025). Studi Literatur: Faktor-Faktor yang Berpengaruh terhadap Produktivitas Tenaga Kerja di Sektor Konstruksi. Journal of Civil Engineering and Planning. 6 (2025) 2746-6299.

Project Management Institute. (2021).

Sekaran, U. & Roger B. (2016). Research Methods for Business: A Skill-Building Approach. West Sussex: Wiley.

Sugiyono. (2013). Metode Penelitian Kuantitatif, Kualitatif, dan R&D. Bandung: Alfabeta

S.G. Naoum. (2016). International Journal of Productivity and Performance Management 65 (2016) 401–421.

Tavakol, M., & Dennick, R. (2011). Making sense of Cronbach’s alpha. International Journal of Medical Education. 2011; 2:53-55

Undang-Undang Nomor 13 Tahun 2003 tentang Ketenagakerjaan.

Yunita, A., & Hidayat, B. (2024). Perbandingan Produktivitas Tenaga Kerja Proyek Konstruksi Pada Jam Kerja Normal Dan Lembur Di Kota Padang. Jurnal Bangunan, konstruksi & Desain. Vol.2 No.3. DOI : https://doi.org /10.25077/jbkd.2.3.180-190.2024.

Published

2026-05-28

Issue

Section

Articles

How to Cite

Farisi, S. A. (2026). Analisis Faktor-Faktor yang Mempengaruhi Produktivitas Tenaga Kerja pada Proyek Infrastruktur Transportasi. Jurnal Rekayasa Infrastruktur, Informatika Dan Komputasi, 1(1), 88-103. https://doi.org/10.36914/jriik.v1.i1.14